Validation Framework (D.6.8)

  • Number of downloads 40
  • File size 9.78 MB
  • Upload-Date 14. January 2021

The document focuses on the evaluation of the last version of the STOP-IT platform under the controlled scenario. With this main objective, this deliverable details the results of the performed tests envisioned under the D6.7, titled Validation framework-Evaluation plan and operational demonstration scenario. In that deliverable, the methodology was described that corresponds with the execution of the test and the communication of the corresponding issues found as a result of those tests. In the present deliverable, we present the execution, and the results of the tests with the main conclusion being the preparation of the STOP-IT platform to reach TRL6 and therefore, ensuring it is prepared for the demonstration and its put in practice in real scenarios across the WP7.